Project Name:Baker Ranch PA 17 (7560)
Location:Irvine, CA
Type:Residential
Contract Value:$ 400,000’s
Project Summary:
Pipeline for new home construction in OC.
Highlights:
Sewer - over 1,600 LF of 8" PVC SDR 35, 48" sewer manholes, mainline cleanouts
Water - over 2,100 lf of 6" and 8" PVC water main, tees, adapters, flushouts, caps, bends, set meter boxes, water services
Storm Drain - over 500 LF of 18"-24" RCP pipeline, junction structures, catch basins, local depressions, concrete collars, manhole raises
Tags: Manholes, New Home Construction, New Residential Construction, Pipeline Construction, Sewer, Storm Drain, Water
| Print