Kana Pipeline Images

Stormwater Chambers

Stormwater Chambers

These stormwater retention chambers were installed for Citibank in Downey, a LEED project. This system was designed with mirafi filter fabric and rock combination to enable the retention and percolation of storm water run-off into the proposed area rather than

Sewer Trench

Sewer Trench

Within this deep sewer trench, is an existing 15" vitrified clay pipe sewer main that had a lateral connection made to it using a "Tap-N-Tee" method. This can save on costs by decreasing trench width on larger diameter pipes whenever

Sewer Tapping

Sewer Tapping

Shown here is a close-up of a type of sewer tapping method where a hole is core drilled into an existing main, and a "tap-n-tee" extension is added to connect a sewer lateral. No sewer saddle is required. This is

Sewer Tap

Sewer Tap

In Garden Grove, CA Kana Pipeline installed a "Tap-N-Tee" to connect a 4" vitrified clay pipe (VCP) sewer lateral to an existing 15" VCP sewer main. No saddle is required for this type of installation. This tee was connected directly

Rain Tank

Rain Tank

This rain tank system is being assembled and will be used as part of a storm drainage systems maintenance plan for a local church in Huntington Beach, CA.

Rain Tank System

Rain Tank System

Kana Pipeline crews are working to install this Atlantis D triple module rain tank system by Kristar at a local church in Huntington Beach, CA.

Rain Tank Installation

Rain Tank Installation

This rain tank system, an Atlantis D by Kristar, consists of 144 total modules and was installed at a local church in Huntington Beach, CA.

Stormfilter Vault

Stormfilter Vault

This 8'x18' stormfilter vault holds 38 filter cartridges and was hoisted using a 120K truck crane. This unit was installed at a local church site in Huntington Beach, CA.

Stormwater Storage Tank

Stormwater Storage Tank

This stormwater storage tank has just been installed using an excavator. This underground fiberglass tank will be used to collect rainwater and irrigate the surrounding school campus.

Construction Zone

Construction Zone

At Cal-Tech in Pasadena at the Linde+Robinson Laboratory renovation project, the construction zone presents challenging tight areas to work around. Preserving existing conditions, and trees while coordinating with other Subcontractors and working around several jobsite trailers is nevertheless a manageable

Stormwater Tank Installation

Stormwater Tank Installation

This tank is ready to be installed in the adjacent trench and will hold up to 40,000 gallons of stormwater which will be used as a secondary rainwater collection system for irrigation purposes.

Shoring Removal

Shoring Removal

Removing hydraulic shores are important to any pipeline or underground construction activities. How they are removed will help prevent trench collapse.