Project Name:Western Christian School (6966)

Location:Claremont, CA

Type:Institutional

Contract Value:$ 100,000’s

Project Summary:

New underground wet utility pipeline construction for existing school undergoing renovation.

Highlights:

Storm Drainage - 9" and 18" PVC SDR 35, drain boxes and headwalls

Water - over 300 LF of 2" PVC Schedule 80, connecting to existing waterline

Sewer - Over 600 LF of 6" PVC SDR 35, sewer cleanouts

The school is located at 3105 Padua Avenue, not too far from Mount San Antonio, also known as Mt. Baldy, which stands at 10,068 ft - the highest peak of the San Gabriel Mountains; also the highest point in Los Angeles County, CA. The terrain at this school site was very rocky since we were relatively close to these mountain foothills. Photos to follow of our construction pipeline work.