Project Name:Watermain Replacement (5930)

Location:Sunset Beach, CA

Type:Public Works

Client:City of Huntington Beach

Contract Value:$ 1,295,430.00

Project Summary:

Sunset Beach water main replacement at various locations. Contract awarded to Kana Pipeline August, 20th, 2012.

Highlights:

This work will include the construction of approximately 1,525 LF of 12-inch and 6-inch buried pipe within eight alleys in the Sunset area of the City of Huntington Beach. The project consists of removing and replacement existing water pipelines, fire hydrants and other appurtenances; and also constructing highline pipelines to provide temporary water service during construction. The alley rehabilitation portion of the work will consist of reconstructing or overlaying the alleys by removing the existing asphalt pavement and base and constructing coldmill and asphalt overlay, and concrete gutters. This work will take approximately two hundred (200) working days to complete.

Locations are:
Alley between 11th and 12th Street.
Alley between 10th and 11th Street.
Alley between 4th & 5th Street.
Alley between 12th and Broadway Street.
Alley between 15th and 16th Street
Alley between 14th & 15th Street.
Alley between 23rd and 24th Street
Alley between 16th & 17th Street
Alley rehabilitation for all sites.

Tags: , , , , , , ,

| Print Print