Project Name:Wallis Annenberg Center (5107)

Location:Beverly Hills, CA

Type:Institutional

Contract Value:$ 300,000’s

Project Summary:

Site wet utilities contract for Wallis Annenberg Center for the Performing Arts

Highlights:

Storm Drainage Systems - includes nearly 2,000 LF of PVC pipeline, drain boxes and grates, a sump pump and concrete vault, curb outlets, infiltration pits, parkway drains, transition structure, mirco channel drains, and other relevant pipe fittings. Retaining wall drains also installed.

Sewer Pipeline - includes nearly 400 LF of PVC pipeline which will to connect to an existing sewer lateral, together with 5 sewer cleanouts.

Domestic Water Pipeline for both the theater and Center includes a 4" hot tap in the street, with a water meter in vault, a backflow, post indicator valve (PIV) and necessary piping.

Fireline for theater includes a hot tap, a double detector check, an 8" PIV, a 2-way FDC and all pertinent piping and patching. A separate fireline system will also be installed for the Center for Performing Arts, complete with pipe and fittings and all other necessary appurtenances.

Read our press release on the underground parking garage pipeline work we did across the street from this project earlier!

Tags: , , , , ,