Project Summary:

New Pipeline for the Sunset Beach Water Main and Pavement Replacement Construction Project CC-1429

Highlights:

Bids were opened publicly in mid October of 2013 where Kana Pipeline was officially awarded the project after providing the lowest responsive and responsible bid, placing 3rd lowest behind a non-responsive bidder and another bidder who withdrew their bid.

This pipeline work is part of the City's water main replacement program, where it was identified that 1,200 LF of old, existing water mains in eight different alleys throughout Sunset Beach were required to be abandoned or replaced; from Warner Avenue to Anderson Street.

This project involves replacing existing 3-4" asbestos cement pipelines installed in the 1950's, with new 6-inch PVC (plastic) pipelines. The project will also include reconstruction of alleys after waterline is installed. It was determined that combining both the water improvements with the street improvements would avoid a second, separate construction impact to local residents and businesses for future pavement rehabilitation.

Fire hydrants will also be installed along Pacific Coast Highway which will allow better accessibility to the Fire Department.