]]>

Project Name:Sewer Replacement and Road Reconstruction (5162)

Location:Fullerton, CA

Type:Public Works

Client:City of Fullerton

Contract Value:$ 1,619,310.00

Project Summary:

Sewer pipeline installation throughout an existing residential neighborhood near Cal-State Fullerton.

Highlights:

Sewer pipeline construction consisting of installing over 3,800 LF if 8" VCP clay pipe main, as well as 8" ductile iron pipeline (DIP), 20 sewer manhole installations and 10 sewer manhole removals, 640ea. sewer lateral reconnections.

Other work included water pollution control, traffic control, clear and grub, sheeting, shoring and bracing, access ramps, sidewalks, curbs and gutters alley returns, street light conduit, adjusting all water valves and manholes to grade.

Kana Pipeline had 80 working days to do this project. See our press release featuring this new sewer construction project.

Tags: , , , , ,

| Print Print