Project Summary:

This project was the largest apartment community project in the Inland Empire (IE) at the time. Read about the North Main Street Corona project, currently the new, largest apartment community project in the IE.

Highlights:

This project was the largest apartment community project in the Inland Empire (IE) at the time. Read about North Main Street Corona project, currently the new, largest apartment community project in the IE.

Sewer pipeline consisting of approximately 4"-8" PVC and VCP offsite and onsite sewer, 48" and 60" manholes, backwater vales, sewer lift station and cleanouts; Domestic and fireline

Fireline and domestic water pipeline consisting of 8" fire service, 10" detector check assemplies, CM&C in the public ROW, testing, chlorination and dechlorination; 3" and 4" water services, hot tap into a 16" water main, offsite fire hydrants, flow offs, flushes, gate valves, sprinkler risers, fire department connections (FDC's) and other fittings and appurtenances.

Storm drainage systems consisting of 120" - 18" reinforced concrete pipe (RCP) installation, temporary corrugated metal pipe (CMP) riser, junction structures, curb openings, area drains, drop inlets, fossil filterse, storm gate manhole, Vortchnies 5000 drainage treatment unit, and area drainage pipeline installation to complete the storm drain system.

Large-Concrete-Pipe.jpgSewer-System-Street-Work.jpg