]]>

Project Name:Renaissance 2 (5368)

Location:Palm Desert,CA

Type:Residential

Contract Value:$200,000's

Project Summary:

Water and sewer pipeline installation of new residential tract, Renaissance 2, Tract # 31490-2.

Highlights:

Water pipeline construction work consists of over 2,200 LF of ductile iron pipeline (DIP) installation, tees, thrust blocks, gate valves, 1" water services - including supplying and setting meter boxes, fire hydrants, hydro testing and chlorination as required per Coachella Valley Water District.

Sewer pipeline construction work consists of over 2,200 LF of 8" vitrified clay pipe (VCP), 48" sewer manholes, 4" lateral lines, air testing, mandrel testing and video inspection as required per Coachella Valley Water District.

Tags: , , , , ,

| Print Print