Project Name:REDA Hemlock Business Center (6696)

Location:Fontana, CA

Type:Industrial

Contract Value:$ 500,000’s

Project Summary:

Underground wet utility pipeline for a new warehouse/distribution center in the Inland Empire.

Highlights:

Storm Drainage Systems - included junction structures, storm drain manholes, grating catch basins, a CMP riser, 286 Chamber System and a 60 Chamber StormTech ® MC 3500 subsurface stormwater management systems, over 1,000 of HDPE pipe, 30" RCP, pressure manhole cover, 12" HDPE

Onsite and Offsite Sewer - Onsite work included over 700 LF of 6" and 8" PVC, sewer manholes and sewer cleanouts; Offsite sewer construction work included a sewer cleanout, 8" VCP sewer, sewer manholes, connection to and re-channeling existing sewer manhole.

Onsite Domestic Water - 3' PVC Sch 40 and a 3" backflow

Special Notes:
The Real Estate Development Associates (REDA) acquired the Hemlock Distribution Center in October 2013 from plastics manufacturer, JM Eagle. The then 358,000 square-foot speculative warehouse/distribution center was completed in the first quarter of 2015.