]]>

Project Name:Mission 71 Business Park II (5804)

Location:Pomona, CA

Type:Commercial

Contract Value:$ 300,000’s

Project Summary:

Kana Pipeline's scope of work includes water main infrastructure replacement inclusive of surveying and potholing, which will be conducted by Kana's SUE Division.

Highlights:

Kana Pipeline's Subsurface Utility Engineering (SUE) Division will be performing multiple potholes to verify vertical and horizontal location of existing utilities, prior to watermain utility relocations and removals.

Water main replacement work for Zones 5 and Zone 8 total over 2,100 LF of ductile iron pipe (DIP) ranging in size from 8" to 12", inclusive of concrete encasements, bends, reducers, tees, gate valves, blow-offs, tapping sleeves, air release valves, fire hydrant assemblies, as well as 2" domestic and irrigation water

Tags: , , , , ,

| Print Print