Project Name:Harvest Village (6418)

Location:Mira Loma, CA

Type:Residential

Contract Value:$ 2,000,000’s

Project Summary:

Sewer, Domestic and non-Potable Water Pipeline installation on Pats Ranch Road Phases 1 & 2.

Highlights:

Site Sewer Pipeline installation on Pats Ranch Road /Phase 1 consists of over 6,300 LF of 8" PVC SDR 35 sewer pipeline main, 160 LF of 8" ductile iron pipeline, over 2,400 LF of 10" and 12" PVC SDR 25 sewer main, 200 LF of 16" steel casing, 200 LF of 4" PVC laterals, 29 ea 48" sewer manholes, 9ea 60" sewer manholes, end caps, video of main, traffic control, signage and striping, and sewer manhole reconstruction.

Site Sewer Pipeline installation on Pats Ranch Road /Phase 2 consist of over 2,000 LF of 8" & 10" PVC SDR 35 sewer main installation, 60" manholes, and video of sewer main.

Water (domestic, drinking) pipeline installation work consists of over 7,200 LF of 8" PVC CL200 water main, over 2,000 LF of 8" CML&C steel pipe, over 2,300 LF of 16" CML&C steel pipe, 35ea. 8" gate valves, 16" butterfly valves, over 20 fire hydrants, steel fire hydrants, "super" steel fire hydrants, over 130 copper water services, setting meter boxes, 1" and 2" air vacs, 4" steel blow offs, 30" x 16" Hot Tap, traffic control, R&R asphalt pavement, signage and street striping.

Non-Potable Water Pipeline installation consists of over 8,200 LF of 8" PVC CL 200, over 110 LF of 8" CML&C Steel Pipe 10-gauge, gate valves, air vac assemblies, reduced pressure backflows, copper water services, chlorination and testing.