]]>

Project Name:First Logistics (6313)

Location:Moreno Valley, CA

Type:Industrial

Contract Value:$ 700,000's

Project Summary:

Installing new pipeline for First Inland Logistics Center in Moreno Valley, which includes offsite storm drainage systems, as well as offsite sewer, water and storm drain pipeline.

Highlights:

Storm drainage pipeline includes installing over 6,000 LF of 12", 18", 24", 30" and 36" HDPE pipeline and fittings, 30" Nyloplast high performance storm drain manholes, a weir structure, perforated pipe, a hydrodynamic Vortex 2000 separator, APWA manholes, a Stormtech ® Chamber System, and storm drain cleanouts and diversion manhole.

HDPE Storm Drain Pipeline.jpg Stormtech Chamber System.jpg

Tags: , , , ,

| Print Print