]]>

Project Name:Eastside and Main Street Water Distribution Main Replacement (5060)

Location:Riverside, CA

Type:Public Works

Client:City of Riverside

Contract Value:$ 1,687,570.50

Project Summary:

Kana Pipeline will furnish and install 12,300 LF of new 8" ductile iron water pipeline infrastructure along Eastside (Phase 1) and Main Street for the City of Riverside.

Highlights: Water pipeline construction street work consists of approximately 12,300 linear feet of ductile iron pipe (DIP) and fittings, 29ea 8" gate valves, 34ea. fire hydrant assemblies, 255 combined 1", 2" and 4" water services as well as 4" and 6" fire services, fire hydrant abandonments, testing, chlorination, sanitary sampling, and flushing; Removing and replacing concrete cross gutters, removing and legally disposing of rail road tracks, shoring, bracing and plating, 3" removal and replacement of asphalt, temporary asphalt paving, Class II Base, Slurry Sealant, Traffic Loop replacement, Traffic Control, Remove and Replace (R&R) street striping; utilizing a Storm Water Pollution Prevention Plan (SWPPP) and Best Management Practices (BMP's).

Tags: , , , , ,

| Print Print