Project Name:Cypress Village PA 40 - Cadenza (5046)

Location:Irvine, CA

Type:Residential

Contract Value:$ 700,000's

Project Summary:

Kana Pipeline to install sewer, fireline, water pipeline and storm drainage systems, for a new tract of residential community homes.

Highlights:

Precise grading area storm drainage pipeline construction work consisting of approximately 2,500 linear feet of 4", 6", 8" and 12" PVC pipe and fittings; furnishing Brooks brand traffic rated catch basins.

Sewer pipeline work consisting of approximately 4,500 LF of 6" & 8" PVC pipe and fittings, raven coated sewer manholes, sewer cleanouts, jet clean and testing.

Domestic and fire line water pipeline work consisting of approximately 2,500 LF of 8" PVC pipe and fittings, reduced pressure backflows, water services, gate valves, fire hydrant assemblies, end-of-line flush outs, testing, chlorinating, dechlorinating and flushing of system.

Reclaimed water pipeline work consisting of approximately 1,600 LF of PVC "purple" pipe and fittings, water services, gate valves, testing and flushing the system.

Fireline system consisting of approximately 70 LF of 4" PVC pipe and fittings, a 2-Way Siamese Fire Department Connection (FDC), double detector check (DDC), thrust blocks, testing and flushing of the fireline system.

Storm drainage systems installation consisting of approximately 2,500 LF of 36", 24", and 18" Reinforced Concrete Pipe (RCP), Junction Structures, Catch Basins, PVC pipe and fittings, Traffic-rated catch basins, local area catch basin depressions, and storm drain cleanouts.