Project Name:Chandler School (4255)

Location:Pasadena, CA

Type:Institutional

Contract Value:$ 200,000's

Project Summary:

Gas line trenching, Storm Drainage Systems, Fireline, Domestic Water and Sewer Pipeline.

Highlights: Storm drainage work consisting of a Stormceptor 3600, 4" 6", 8" and 12" PVC SDR 35 plastic pipe, 12x12, 18x18, 24x24 drain boxes, cleanouts, area drains and parkway drains; sewer pipeline construction work connecting to the existing sewer, installing 4", 6" and 8" PVC SDR 35 pipe and cleanouts to grade; Domestic Water Pipeline work consisting of connection to city installed meter, 4" backflow, PVC piping, fittings and thrust blocks; Fireline work connecting to the existing fireline, running 6" and 8" PVC C-900 CL200 pipe; installing fittings and thrust blocks, fire hydrant assembly, 2-way Fire Department Connection, Post Indicator Valve, Sprinkler Riser; Gasline trenching, bedding ,shading and backfill.