Project Name:Ceres Way Apartments (4520)

Location:Fontana, CA

Type:Residential

Contract Value:$ 300,000's

Project Summary:

This pipeline construction project contains fireline, domestic water pipeline, sewer and storm drainage systems including an inline oil grit separator stormwater treatment unit, for a new residential tract of apartment homes.

Highlights: Kana Pipeline will be installing approximately 50LF of 6" sewer in the public right-of-way, connecting to the City's main to provide sewer service to the site consisting of approximately 1,000 LF of 4" and 6" PVC sewer pipe lines, cleanouts, related sewer testing, asphalt repair and traffic control; Fire line pipeline work consisting of fire hydrant assemblies, temporary blow-offs, fire service risers, fire department connection (FDC) assemblies, connecting to Fontana's Fire Service in two locations as well as connecting to 3" meter assemblies; installing approximately 1,220 LF of 8" and 10" C-900 CL150 PVC pipe for domestic water; 100 LF of 4" ductile iron pipe (DIP) and fittings, concrete thrust blocks, flushing chlorination and testing; 8" gate valves, pipe restraints, air vac assemblies and post indicator valves (PIV); storm drainage systems consisting of approximately 1,800 LF of combined 6", 12", 18" and 24" HDPE pipe; 600 LF of 24" perforated corrugated metal pipe (CMP), 24" and 12" CMP riser, storm drain manholes, catch basins, 12" NDS tapered catch basins, a Contech Drainage System model PMSU 2015 storm water treatment unit and 60" storm drainage detention system.

Detention-Systems.jpgCatch-Basin-Staking.jpg

Tags: , , , , , , ,

| Print Print