Project Summary:

Sewer and Water Pipeline Improvement Plan work for the construction of new homes called Bellegrave.

Highlights:
Preparing for new large tracts of homes in the vicinity of Wineville and Bellegrave Avenues; Tracts 31768 and 3177-1

For Wineville Tract 31778-1

Sewer (offsite) work consisting of 3 manholes, over 500 LF of 10" PVC sewer main, removing asphalt, base paving and cap paving per County of Riverside Standards,
Sewer (onsite), work consisting of 24 ea. 48" sewer manholes, over 4700 LF of 8" PVC sewer main, 4,000 LF of 4" PVC sewer laterals,

Water (offsite at Wineville), 70 lf of 8" PVC, fire hydrants,

Water (onsite), over 5,300 LF of 8" PVC water main, 100LF of 8" cement mortar-lined and coated steel (CML&C) pipe, gate valves, tees, bends, water services, backflows, air vacs.

Storm Drain (offsite), 30LF of 30 RCP, junction structures, catch basins,

Storm Drain (onsite) contains over 3,400 LF of reinforced concrete pipe (RCP) of the following sizes, 18", 30", 36" 42", 48" and 54"., a concrete forbay, storm drain manholes, catch basins, concrete bulkheads, concrete drop inlets, transition structures, an reinforced concrete box, headwalls with trash rack and fencing, and pipe swing gate.

For Wineville Tract 31768

Sewer Pipeline (onsite) installation of over 36ea. 48" sewer manholes, over 8,500 LF of 8" PVC for sewer main, over 6,300 LF of 4" PVC for sewer laterals, concrete encasements,

Water Pipeline (offsite/Cantu-Galleano) installation of gate valves, fire hydrants, blow off, air vacs, water services, backflows, caps, bends, tees, removing asphalt, base paving, and capping over, per County of Riverside Standards.

Water Pipeline (offsite/Bellegrave) installation of over 20 LF of 8" CML&C, bends, tees, water services, backflows, removing asphalt, base paving, and capping over, per County of Riverside Standards.

Water Pipeline (onsite) installation of over 9,400 LF of 8" PVC water pipeline main installation, over 30 gate valves, over 25 fire hydrants, over 700 LF of 8" CML&C steel pipe, crosses, tees, bends, air vacs, blow offs,

Storm Drain Pipeline (offsite / Cantu-Galleano) consisting of concrete drop inlet, over 50 LF of 18" RCP, concrete collars, removing bulkhead, removing asphalt, base paving, and capping over, per County Standards.

Storm Drainage Systems(onsite) consisting of drop inlets, over 2,000 LF of 18", 24", 30" and 36" RCP, storm drain manholes, concrete collars, catch basins, removing bulkheads, alternate TRITON Catch Basin and Drop Inlet brand Filter options.

All sewer pipeline work installed in its entirety per Jurupa Community Services District (JCSD)/City of Jurupa Valley Standards.