Track
The bore and tunnel work featured here is working on a track system. A track car will go inside this 84" steel pipe casing tunnel to collect soil gathered from tunneling operations.
1639 E. Miraloma Avenue Placentia, CA 92870

The bore and tunnel work featured here is working on a track system. A track car will go inside this 84" steel pipe casing tunnel to collect soil gathered from tunneling operations.