9 results displayed (1 - 9):

Sewer Line

Pipeline construction crew installing extra strength vitrified clay pipe (VCP) for a new residential construction project. ...

Bolting Concrete Footings

Pipeline construction crew worker shown here bolting a 2'x2' concrete footing in preparation to strap down approximately 2,500 LF of a fused 12" HDPE domestic water pipeline, and secure it in place. ...

Patching Concrete

This is a frontal view of a concrete energy dissipator basin that has just been finished patching. Construction crews will sweep out and add riprap at the exit end of this basin. ...

Energy Dissipator Basin

Diagonal view of a concrete energy dissipator basin that was recently formed with wood and concrete poured. Construction Structure crews are now working to remove the wood forms and preparing to patch for a complete finished product. ...

Pouring Concrete

Pipeline construction crews are pouring concrete to form a junction structure at an intersection that will serve to connect a concrete storm drain pipeline and storm drain manhole. ...

Concrete Structures

Kana Structure Crew prefabricated these rectangular reinforced concrete 48" x 78" structures on premises for storm drain vaults needed on a residential project elsewhere due to space restrictions....

Construction Surveying

Construction Pipeline crew is reading survey staking provided by Civil Engineering firm and preparing the path for sewer and storm drainage pipeline installations....

Reinforced Concrete Structures

Kana Structure Crew prefabricated these rectangular reinforced concrete 48" x 78" structures on premises for storm drain vaults needed on a residential project elsewhere where construction working space was limited....

Construction Night Job

Kana Crew working at night to install Sewer Main at major intersection....