Kana Pipeline Images
Sewer Pipeline
Orange colored pipe is typically made of vitrified clay pipe (VCP) material and is a prime indicator that this pipeline is a sewer-specific wet utility pipeline system.
Wet Utility Contractors
Wet utility contractors, like Kana Pipeline, can install water pipeline, sewer and storm drainage systems. Here, Kana Pipeline is digging with an excavator to install sewer pipeline for a new building add-on to an existing building.
Tunnel Spoil
This is the spoil of soil collected underground in the adjacent bore pit. Pipeline construction crews are working to bore and tunnel an 84" steel pipeline casing underneath railroad tracks that cross this pipeline at a perpendicular angle. Within this
Muck Bowl
A muck bowl is a term used in construction boring and tunneling operations for the container that carries excess soil from underground pipeline tunneling operations.
Pipe Tunnel Inside
This is what it looks like from the inside of this 84" steel pipe casing which is facing out towards the track car. Can you imagine yourself being inside this pipe?
Tunnel
This is the view from inside the 84" diameter wide tunnel, made of 1" thick steel, being used as a casing to bore through native underground soil. The purpose of this bore is to make way for the installation of
Tunnel Bore
This is an 84" steel pipe casing which is being used to install 60" reinforced concrete pipe (RCP) which will run underneath a railroad track, to provide storm drainage pipeline service from a local airport.
Track Car
This track car is going inside this 84" steel pipe to scoop up the inside of the dirt collected from boring operations.
Track
The bore and tunnel work featured here is working on a track system. A track car will go inside this 84" steel pipe casing tunnel to collect soil gathered from tunneling operations.
Tunneling
Here, Kana Pipeline is boring and tunneling underneath a railroad near the Riverside Airport to extend a 60" reinforced concrete (RCP) storm drain pipeline within an 84" steel casing.
Underground Garage
Underneath this street, on Crescent Drive, in front of Beverly Hills City Hall, exists a newly built 3-level underground parking garage. Kana Pipeline provided massive pipeline utility relocations necessary in order to build out this garage, and then installed new
Subsurface Utility Engineering Companies
This is one of several projects where Kana Pipeline's Subsurface Utility Engineering (SUE) Division contracted to locate and mark the underground utilities within a gas company facility.